Home Appendix Glossary Questions Links Contact Us
Admin Login

Search Tips
 

 
1)
Unified Development Manual Introduction
 
 
2)
Land Use Regulations
 
 
3)
Property Improvement Regulations
 
 
4)
Off-Site Improvement Regulations
 
   
43)
Department of Public Works
 
   
45)
Storm Drainage Requirements
 
   
46)
Encroachments & Other Uses in the Public ROW
 
   
47)
Off-Site Construction Improvement Requirements for Property Development
 
   
51)
Wastewater Services
 
   
52)
Water Services
 
   
53)
Reclaimed Water Services
 
   
Appendices
 
 
5)
Construction Standards
 
 
8)
Recent Code and Appendix Updates
 
 
9)
System Development Fees Effective October 8 and December 29, 2008
 
 
10)
System Development Fees Effective July 1, 2009
 
 
11)
View Presentation on the City's Development Process
 
 
12)
Planning & Development Proposed Fees Effective 8-3-09
 

Appendices



HOME SECTION 4) Off-Site Improvement Regulations
SECTION 4 : Off-Site Improvement Regulations
The adoption of Code in this chapter does not authorize any use or the continuation of any use of a structure or premises in violation of any City Ordinance on the effective date of this Code. Where discrepancies occur between Unified Development Manual text and Municode text, Municode text shall prevail.
CHAPTERS

43)
Department of Public Works
   
5) Adoption of public works standards, specifications and regulations
   
6) Delegation of responsibility for floodplain management
45)
Storm Drainage Requirements
   
1) Uniform Drainage Policies and Standards adopted
   
2) Compliance with storm drainage regulations
   
8) Non-stormwater discharges
46)
Encroachments & Other Uses in the Public ROW
   
1) Definitions
   
2) Encroachment permit required
   
3) Minor encroachment permit--Class 1 permit
   
4) Encroachment permit for sidewalk furniture--Class 2 permit
   
5) Landscape maintenance encroachment permit--Class 3 permit
   
6) Telecommunications services--Class 4 encroachment permit
   
7) Encroachment permit for fiber optic cable, interstate services and other communication, conduction or transmission facilities excluded from telecommunications and telecommunications services
   
8) Cable services/television and related services
   
9) Utilities encroachment permit
   
10) Street excavation encroachment permit--Class 8
47)
Off-Site Construction Improvement Requirements for Property Development
   
1) Definitions
   
2) Design requirements
   
3) Required improvements
   
4) Undergrounding of overhead utility lines
   
5) Off-site construction--Permits, plans and specifications
   
6) Fee for review of off-site improvement plans and civil improvement plans and specifications
   
7) Inspection and testing of off-site construction
   
8) Approval, acceptance, and assurances of construction
   
9) Performance bond or cash deposit; off-site improvements
   
10) Validity of permit
   
11) Deferral of off-site improvements
   
12) Street financing policy
   
13) Scalloped street assessments
   
14) Private streets
   
15) Traffic signals and streetlights
   
16) Disposition of unnecessary rights-of-way
   
17) Enforcement and severability
51)
Wastewater Services
   
1) In General
   
2) Sewer Main Extensions
   
3) Wastewater Pretreatment Program
52)
Water Services
   
1) General
   
2) Irrigation Water
   
3) Water Main Extensions
   
4) Backflow and Cross-Connection Control Program
   
5) Water Use Regulations During Stage Four Drought.
53)
Reclaimed Water Services
   
1) Definitions
   
2) Policy established
   
3) Priority of delivery
   
4) Agreement required
   
5) Reclaimed water meters required
   
6) Tampering forbidden
   
7) Interference with City employees/agents prohibited
   
8) Disconnection of reclaimed water service for violation of chapter
   
9) Contract for extension of reclaimed water mains
   
10) Reclaimed water main extension reimbursement agreement
   
11) Establishment of current costs
   
12) Buy-in assessments
   
13) Engineering requirements
   
14) Storage requirements
   
15) Permits, inspection and acceptance of improvements
   
16) Operation of turnout structures
   
17) Extension of reclaimed water service outside City limits
   
18) Penalties
 
Appendices
   
1) Agreement for Occupancy Permit to be Withheld in Lieu of Performance Bond (Rev 10-28-04)
   
2) Agreement to Extend Utility Service Outside City Limits (Rev 6-9-06)
   
3) Benchmarks - Horizontal and Vertical Control
   
4) Certificate of Quantities for Encroachment Permit (Rev 7-1-09)
   
6) Civil Eng Electronic Submittal Requirements (New 5-18-06)
   
7) Civil Eng Erosion and Sediment Control Plan (ESCP) Review Checklist (New 1-8-08)
   
8) Civil Eng Erosion and Sediment Control Plan Cover Sheet
   
9) Civil Eng Erosion and Sediment Control Plan Sheet 2
   
10) Civil Eng General Notes (Rev 1-8-09)
   
11) Civil Eng Grading and Drainage Notes
   
12) Civil Eng Grading & Drainage Plan Review Checklist (Rev 2-15-08)
   
13) Civil Eng Improvement Plans Submittal Form (Rev 8-3-09)
   
14) Civil Eng On-Lot Retention Policy
   
15) Civil Eng Paving Notes
   
16) Civil Eng Paving Plan Review Checklist
   
17) Civil Eng Preliminary Technical Site Review Checklist (Rev 8-3-09)
   
18) Civil Eng Preliminary Technical Subdivision Review Checklist (Rev 8-3-09)
   
19) Civil Eng Reclaimed Water Notes (Rev 1-8-09)
   
20) Civil Eng Revised Plan Review Checklist (Rev 8-3-09)
   
21) Civil Eng Sewer Notes (Rev 1-27-09)
   
22) Civil Eng Sewer and Reclaimed Water Plan Review Checklist (Rev 11-18-09)
   
23) Civil Eng Signing and Striping Notes
   
24) Civil Eng Site Plan Review Checklist (Rev 6-6-08)
   
25) Civil Eng Streetlight Notes APS Area
   
26) Civil Eng Streetlight Notes SRP Area (Rev 12-23-08)
   
27) Civil Eng Streetlight Plan Review Checklist (Rev 10-1-08)
   
28) Civil Eng Traffic Signal Plan Review Checklist
   
29) Civil Eng Underground Retention Storage Tank Review Checklist (Rev 4-19-06)
   
30) Civil Eng Utility Company Notes
   
31) Civil Eng Vacation/Abandonment Plat Requirements Checklist 4-13-07
   
32) Civil Eng Water Notes (Rev 1-8-09)
   
33) Civil Eng Water Plan Review Checklist (Rev 7-15-09)
   
34) Civil Improvements/Encroachment Permit & Street Cut Application (Rev 4-6-07)
   
36) Grading at Owner's Risk Permit Disclaimer (Rev 7-1-09)
   
37) Offsite Construction Estimate for Civil Performance Bond (Rev 12-19-06)
   
38) Offsite Construction Estimate for One-Year Warranty Bond (Rev 12-19-06)
   
39) Performance Bond Procedures
   
40) Private Development Testing Procedures
   
41) Real Estate Checklist for Processing Separate Instruments
   
42) Reclaimed Water Users Manual and Application
   
43) Stormwater Quality Protection Manual
   
44) Streetlight Energization Procedure (Rev 12-23-08)
   
45) Wastewater Discharge Questionnaire
   
46) Water Use Plan
   
47) 2009 Standard Details & TDM Letter of Advisement
   
48) 2009 Change Summary
   
49) 2009 Standard Details & Specifications
   
50) 2009 Standard Details - 100 Series, General Information
   
51) 2009 Standard Details - 200 Series, Streets
   
52) 2009 Standard Details - 300 Series, Water
   
53) 2009 Standard Details - 400 Series, Wastewater
   
54) 2009 Standard Details - 500 Series, Storm Sewer and Drainage
   
55) 2009 Standard Details - 600 Series, Signage
   
56) 2002 Technical Design Manual 1 - Water System Design
   
57) 2002 Technical Design Manual 2 - Wastewater and Reclaimed Water System Design
   
58) 2002 Technical Design Manual 3 - Storm Drainage System Design
   
59) 2007 Technical Design Manual 4 - Street Design and Access Control
   
60) 2007 Technical Design Manual 5 - Traffic Signal Design
   
61) 2007 Technical Design Manual 6 - Streetlight Design
   
62) TDM 6 - January 2009 Memorandum Update
   
63) 2007 Technical Design Manual 7 - Traffic Barricade Design
   
64) 2002 Technical Design Manual 8 - Landscape & Irrigation Design, ROW/Ret Basins/Parks
   
65) Reclaimed Water Service Conversion Process (6-29-09)
   
66) Proposed 2010 Change Summary
   
67) Proposed 2010 Standard Detail Update
View Printable Version
< Previous   Next >
Site Designed in Coordination with Community Sciences Corporation